Friday, April 24, 2026

Before the Yanks Arrived: The St. Mihiel Salient Was a Major Battlefield in 1915


French Trench Bois Brulé, St. Mihiel Sector, 1915

By Terrence Finnegan 

The town of St. Mihiel on the Meuse River fell to the Germans on 24 September 1914, the beginning of a four-year occupation. American commentary four years later assessing the front line stated, "The German possession of St-Mihiel cuts both canal and railroad at that place and greatly embarrasses the French transportation system." The consequences of this German attack at St. Mihiel were serious. It placed the main rail, road, and canal supplying Verdun in enemy hands and brought the main lines of communication into Verdun within range of German guns. Verdun was supplied by a single railway the Petit Meusin, a narrow gauge line running from Bar-le-Duc. The danger presented by such conditions became evident when the battle of Verdun started in February 1916. Verdun was effectively neutralized as a base from which the French could conduct sustained and meaningful offensive operations in the region. To France, the German occupation of St. Mihiel became a visible and lasting hernie (hernia).


Early Development of the St. Mihiel Salient
9 September 1914


Minor skirmishes became the norm for the most part. A French attack against St. Baussant on 12 December met with catastrophic losses, including several hundred prisoners taken by German forces. In December 1914 General Joffre placed the 32e corps d'armée at the disposal of General Sarrail. The simultaneous advance of the Germans on the heights of the Meuse and in the Argonne alerted Joffre to place more effective fighting units at the Woëvre. He personally considered the 32e corps d'armée to be one of the best

The new year saw General Joffre focusing on St. Mihiel. He issued a series of instructions on 21 January, ordering an attack against General der Infanterie von Strantz's detachment presently holding St. Mihiel on the east bank of the Meuse. The following months did not achieve the goal Joffre sought. On 18 March he informed General Dubail that he wanted IVe d'armée to undertake the operation to reduce the St. Mihiel salient as soon as possible, employing all means at his disposal in this attack. General Dubail had four corps d'armée and a corps de cavalerie to work with. GQG [French General Headquarters] planned an offensive for 5 April on the southern Woëvre plain to relieve Verdun. 

The plan comprised two simultaneous attacks on either arm of the salient, one in the direction of Verdun to La-Chaussée and the other centered on Toul-Thiaucourt. On 30 March the French 73e division d'infanterie attacked along the Moselle River capturing over 500 metres of enemy trenches west of Bois-le-Prêtre in the Quart-en-Réserve. The 1re corps d'armée and 2e corps d'armée, which were to operate east of Verdun and against the northern arm of the St. Mihiel salient, were moving up the line with the intent of establishing themselves within assaulting distance, where they were to remain until the artillery bombardment commenced. The 31e corps d'armée established itself at several points only 100 meters from the edge of Bois de Mort-Mare (Death Pond).


German Trench in the Eastern Part of the Sector

Other offensive thrusts were made in early April. But things bogged down. Surprise was essential but the most difficult element to bring about. Orders were issued for absolute secrecy but, in spite of this, it was disconcerting to Maréchal Joffre how rapidly news spread. He discovered to his chagrin that the date and location of the attack was becoming common knowledge in Paris. With the advantage of surprise lost, the Germans responded by beefing up their forces.

[Also] Unfortunately for the French, the April weather turned to rain. At first sight, it seemed to Maréchal Joffre that the weather supported the French thanks to the lack of effective German aerial reconnaissance. The Woëvre became a quagmire and the trenches within flooded. The artillery found it difficult to take up position, observation of fire was almost impossible, and the shells buried themselves in the spongy ground. A feeling of uneasiness spread to both troops and staffs. Joffre thought a postponement prudent but French soldiers could not be kept for long in the misery that came with flooded trenches. General Dubail gave the order for the attack to commence. French forces bogged down and German artillery annihilated those stuck in the clay. For four days, half of the existing stock of French heavy guns attempted to cut the wire obstacles in front of the French infantry.


French Observation Post, Eparges Spur


In an attempt to salvage the failing offensive, General Dubail ordered his armée to change its tactics of intense assault to "methodical progression." The new directive did not include the old advantage of surprise. The result of the campaign was disastrous. From 26 March to 30 April 1915, the French lost 65,200 officers and men. In comparison, German losses suffered in the same period throughout the entire Western Front were slightly over 80,000 officers and men. Dubail's failed offensive was the last major operation in the south Woëvre front. Fighting continued through June 1915, but the St. Mihiel hernia remained. Henceforth, names like Seicheprey and Bois-Brulé indicated minor skirmishes until the Americans occupied the south Woëvre front in February 1918.

Source: A Delicate Affair on the Western Front: America Learns How to Fight a Modern War in the Woëvre Trenches by  Terrence Finnegan 

No comments:

Post a Comment